view the big map with a meters above the sea level graph

The Great Naruto Bridge, built in 1985, had two layers: a highway and the Shinkansen. However, the government stopped the construction of the Shinkansen, and the first floor was wasted.
A ferry that bicycles could ride ran in the past, but it was discontinued. I cannot cross the straits by bicycle.
To make a bicycle path, in substitution for the Shinkansen, is a wish of the cyclists. It would be an advancement for Japan.

90.74Km / 6hours

0 comments



Japan Part for LABEL

Japan Part for LABEL

Powered by Lang-8 friends

boso.cycle@gmail.com


Taka
If you want to know the details, write a comment or send an email.

free counters